Burj Al Arab Company's work in the Maysan and Basra governorates, Wasit, in the oil fields. The work included: 1. Installing 66 KV electricity towers 2. Installing 33 KV overhead power transmission lines at CPECC 3. Installing kiosk stations 4. Installing electricity poles 5. Installing steel-reinforced aluminum conductor wires with CPF 6. Installing cables in the Gazprom field in Badra
Construction of electrical poles and installation of foundations in the Majnoon, Bazargan and Halfaya oil fields in Maysan and Basra governorates in Iraq.