أعمالنا

السابق التالي
Burj Al Arab Company's Electric work in the Maysan and Basra governorates, Wasit, in the oil fields

Burj Al Arab Company's work in the Maysan and Basra governorates, Wasit, in the oil fields. The work included: 1. Installing 66 KV electricity towers 2. Installing 33 KV overhead power transmission lines at CPECC 3. Installing kiosk stations 4. Installing electricity poles 5. Installing steel-reinforced aluminum conductor wires with CPF 6. Installing cables in the Gazprom field in Badra

عدد الصور: 16 عرض كامل
السابق التالي
Certificate of appreciation from Cpecc company to Burj Al Arab General Contracting Company

Certificate of appreciation from Cpecc company to Burj Al Arab General Contracting Company

عدد الصور: 2 عرض كامل
السابق التالي
Asphalt paving and planning in the Majnoon, Bazargan and Halfaya oil fields

Asphalt paving and planning in the Majnoon, Bazargan and Halfaya oil fields in Maysan and Basra governorates in Iraq.

عدد الصور: 20 عرض كامل
السابق التالي
Hidden drilling in the Majnoon, Bazargan, and Halfaya oil fields

Hidden drilling in the Majnoon, Bazargan, and Halfaya oil fields in Maysan and Basra governorates in Iraq.

عدد الصور: 16 عرض كامل
السابق التالي
Concrete civil works in the Majnoon, Bazargan and Halfaya oil fields

Concrete civil works in the Majnoon, Bazargan and Halfaya oil fields in Maysan and Basra governorates in Iraq.

عدد الصور: 20 عرض كامل
السابق التالي
Construction of electrical poles and installation of foundations in the Majnoon, Bazargan and Halfaya oil fields

Construction of electrical poles and installation of foundations in the Majnoon, Bazargan and Halfaya oil fields in Maysan and Basra governorates in Iraq.

عدد الصور: 20 عرض كامل
عرض المزيد