Burj Al Arab Company's work in the Maysan and Basra governorates, Wasit, in the oil fields. The work included:
1. Installing 66 KV electricity towers
2. Installing 33 KV overhead power transmission lines at CPECC
3. Installing kiosk stations
4. Installing electricity poles
5. Installing steel-reinforced aluminum conductor wires with CPF
6. Installing cables in the Gazprom field in Badra